Town Projects

  1. Community Projects / Development Map
  2. Capital Project Status
  3. Bids / RFPS
Interactive Map
Use the Community Projects / Development Map to find out locations and detailed information about public hearings, planning projects, oil & gas, and construction projects.

Capital Projects Planned for 2016
Engineering Department

•Eastman Pk. Dr / 7th St Roundabout Construction ($1,085,320) Road Impact Fees
•County Line Road ditch erosion mitigation design ($50,000)
•9th Street / Main Street traffic signal ($180,000)
•SH257 & Walnut Street Left Turn Lane ($55,000) Road Impact Fees
•Crossroads Blvd / WCR 13 traffic signal ($340,000)
•Harmony Road / WCR 15 traffic signal design ($16,000)
•New Liberty Road extension ($2,000,000) Road Impact Fees
•Street Maintenance – overlay ($1,500,000)
•Street Maintenance – crack seal, chip seal, and concrete replacement ($600,000)
•Poudre River maintenance ($75,000)
•Water line oversizing Winter Farm / Village East ($28,788)
•Northern Integrated Supply Project (NISP) ($289,000)
•Kyger Reservoir Pump Station and water supply ($2,614,281)
•Sewer line oversizing Winter Farm / Village ($19,362)
•Storm Drainage – Law Basin Master Plan Channel ($620,171 + $692,138 FEMA PDM grant + $685,785 CDBG grant)
•Storm Drainage – Law Basin West Tributary Channel ($1,050,500)

Parks, Recreation & Culture Department
Community Recreation Expansion Center Expansion completion through bond issue ($7,215,695)
•Boardwalk Performance Venue ($500,000)
•Boardwalk Trash enclosure ($40,150)
•Main Park irrigation design ($9,000)
•Main Park Pickle Ball Court ($25,100 + $20,000 GOCO grant)
•Main Park replace shelters ($53,190)
•Chimney Park south parking lot slurry/stripe ($15,000)
•Chimney Park north shelter ($27,310)
•15th & Walnut Street development ($100,000)
•Poudre Trail from Westwood Village ($240,000 + $10,000 Poudre Heritage Alliance grant)
•Windsor Trail: Easement acquisition at BROE ($5,000); Jacoby road easement acquisition 13 to New Cache ditch ($20,000); Crossing improvements of CR19 and the #2 ditch ($23,107);Hwy 392 trail design ($185,000)
•Museum Interpretive Landscape Ph 3 Planning ($82,645)
•Eaton House: Assessment ($5,000+ $10,000 State Historical grant); Master Plan ($5,000 + $20,000 Poudre Heritage Alliance grant)
•Non-Potable Water – Modify Chimney Pk north to Non-Potable service; splitter box East of Chimney Pk ($132,000)

Public Works Department
•Railroad crossing improvements CR15 and Hwy 34 ($40,000)
•CR15 South of Crossroads ($130,000)
•Water lines rehab/replacement 16” south of Riverbend Park ($798,000)
•Manhole Rehab ($40,000)
•Sewer line rehab Hemlock including Larch Dr, Juniper Dr & Hemlock Ct ($83,370)
•Sewer Nutrient Project $402,000 paid by Colo Dept of Pub Health & Education grant)
•Sewer lift station #4 replacement ($515,000)
•Fleet vehicles, new, replacement, lease exchange ($590,000)

 Information Technology Department
•GIS Asset management software ($150,000)
•IT – Studio Equipment upgrade ($125,000)